Thursday, July 7, 2011

The room, ya'll

The past month or so I've been absent from the website, but calm down, I've had good reason.  Last month I was on a lovely vacation lounging with the Dreese SASO squad and upon returning I've jumped right back into super productivity mode working on the baby's room.  In the past few weeks we've gone from the final stages of drywall finishing, to priming, to painting, to flooring.  Behold, by the power of the internet and digital photographs you can take the journey with me.  Come on, friend!





So far all we have left is the trim-work, adding doors to the closet and swapping out the bedroom door for one of the six-paneled variety (along with painting all said trim and door items).  Once that's taken care of I'll get to have a lot of fun assembling furniture type items and getting everything set up.  As long as it's taken I'm surprised it's turning out as well as it is, even though the bulk of the thanks can go to my drywall finishing teacher.  As a first timer I'm unbelievably happy with the results so far, unfortunately it's not reminded me that all the remaining rooms in our house are even uglier than before, if that was somehow possible.

Lastly, Amber reminded me yesterday that we only really have about 10 weeks left of baby-free living, which is fairly terrifying.  So yea, holy crap.

No comments:

Post a Comment